Coat
Once the tub or shower unit is set and inspected, our crew masks the surround and sprays the coating. About an hour per unit, cured within hours. Your schedule doesn't notice we were there.
Tubbers sprays a tough, peelable coating onto bathtubs and shower pans right after install. It takes the beating of construction - mortar, grout haze, paint, dropped tools - then peels off clean at punch-out. No scratches. No refinishing bills. No surprises at walkthrough.
The short version
It's a liquid coating we spray directly onto the tub or shower surface. It cures into a seamless, rubbery film that bonds lightly to the finish - tight enough to stay put for months of construction, loose enough to peel away by hand when the job is done.
Think of it as masking film that actually fits. Adhesive films wrinkle, lift at the drain, and leave gaps around curves. Cardboard and blankets shift. A sprayed coating covers every inch - floor, walls, apron, edges - and stays there until your crew pulls it off in sheets.
If you've been taping cardboard into tubs or writing "protect tub" on the punch list and hoping, this is the alternative.
Process
Once the tub or shower unit is set and inspected, our crew masks the surround and sprays the coating. About an hour per unit, cured within hours. Your schedule doesn't notice we were there.
The film rides through tile, paint, trim, and punch-prep. Dropped tools, mortar, grout haze, paint, dust, and foot traffic around the tub bounce off. The tub underneath stays untouched.
At punch-out, one person lifts an edge and peels the coating off in sheets. No solvents, no scraping, no residue. The tub is exactly as it was on install day.
The math
Every superintendent knows the line item. A tub gets chipped or scratched in week three, and by week twelve you're paying to fix a fixture that was perfect when it went in.
Multiply that by every unit where the cardboard slipped, the blanket moved, or a trade didn't care. It adds up fast across a community.
In most cases, coating a unit costs less than a single refinish - and you're paying it once, on your schedule, instead of chasing repairs at the end.
Cost ranges shown are typical industry figures for the damage-repair side; your numbers will vary by market and fixture. We're happy to walk through your actual per-unit repair spend and quote against it.
Why builders switch
Tub damage stops being something you find at walkthrough. There's nothing to find.
No waiting on refinishers or replacement plumbing in the last two weeks before closing.
Per-community scheduling and volume rates. We coordinate with your supers, not the other way around.
Full coverage that doesn't shift, costs less than one refinish, and removes in minutes.
Fit
Dozens or hundreds of identical fixtures going in on a schedule. This is where the math works hardest.
High unit counts, tight turn times, and trades stacked on top of each other in small bathrooms.
Keep the client's existing or newly set tub perfect while the rest of the bathroom gets torn apart around it.
Straight answers
It's rated for the full construction cycle - up to 12 months exposed. Sun, mud, dust, and foot traffic around the tub don't break it down. It stays put until your crew peels it.
Right after the tub or shower unit is set, plumbed, and inspected - before tile, paint, and finish trades start working around it. Application takes about an hour per unit and cures within hours.
By hand, at punch-out. Lift an edge and peel the coating off in large sheets - no solvents, no scraping, no residue. Most units take under ten minutes.
No. The coating is formulated for factory finishes - acrylic, fiberglass, porcelain enamel, cultured marble - and releases clean without pulling gloss or leaving haze. The tub underneath is exactly as it was on install day.
Bathtubs, shower pans and bases, surrounds, jetted tubs, and most factory-finished bath surfaces. If your community uses an unusual fixture, we'll coat one unit as a test first.
Coverage
We work with production builders and developers statewide, including:
Running a community outside these counties, or just over the state line? Call us - if the unit count makes sense, we'll make the drive make sense.
Get a quote
Tell us your unit count and build schedule and we'll come back with a per-unit number. If you want to see it first, we'll coat one unit on your current project as a demo.